Building Project

Making Room

Current progress

 

God is building his church!

Our church family is growing and it’s time to make room!

After over two years of praying and planning and meeting, we believe God is leading us to expand. We’ve maximized our current Welcome Center for over 20 years, but we are out of room.  

The new lobby will provide room for guests and our growing church family to come early and stay late. It will provide space for community, discipleship and fellowship.  

The cozy fireplace will be a perfect environment for prayer gatherings and encouraging conversations.  The café will provide fresh drinks, snacks, and refreshments that can be enjoyed before or after our service times. 

We’ve remodeled much of the interior already, and this project will provide the exterior a facelift. 

In a time when the world seems to divide us, we are creating a space that brings us together.

The best is yet to come!  

Pastors Benny & Kelli Ferguson

Lead Pastors

NEW BUILDING F.A.Q.

What is the overall plan for the new building/lobby?

a. Add brand new gathering space (Lobby).
b. New café
c. New fireplace gathering area.
d. Open existing 7 ft hallway between Welcome Center and Main Auditorium by taking wall (with mission statement) back to the rear wall of Welcome Center (approximately 15 ft) and demo-ing existing bathrooms, creating new square footage and re-purposing existing area.
e. Add covered walkways from the parking lot to the front doors.
f. Facelift and update exterior of existing buildings to match new building.

What is the overall plan for the new building/lobby?

a. Add brand new gathering space (Lobby).
b. New café
c. New fireplace gathering area.
d. Add loft style space over new café.
e. Open existing 7 ft hallway between Welcome Center and Main Auditorium by taking wall (with mission statement) back to the rear wall of Welcome Center (approximately 15 ft) and demo-ing existing bathrooms, creating new square footage and re-purposing existing area.
f. Add covered walkways from the parking lot to the front doors.
g. Facelift and update exterior of existing buildings to match new building.

How long will it take from start to completion?

Approximately 6 months.

How will construction affect our worship services?

a. The construction crew will keep a clean worksite.

b. At some point the 2 sets of double doors may be unavailable, at which time, we will utilize the entrances on either side of the chapel and the carport entrance.  

 

 

Will there be parking issues during construction?

During construction, there should be minimal parking disruption.

Are we remodeling or adding space to the main auditorium?

Not during this project. As the church grows, that may be a future project.

Where will the bathrooms be located?

a. There will be a new men’s, women’s, and family restroom in the new lobby.
b. Existing bathrooms (near welcome center) will be demo’ed, allowing for moregathering space.

Are we adding parking?

Not at this time. We are not adding capacity to the Main Auditorium so we are not required to expand the parking lot.  

Are we adding parking?

Not at this time. We are not adding capacity to the Main Auditorium so we are not required to expand the parking lot.

What can we as the congregation do to help?
  1. Pray. As always, we pray first. Join us in praying for all the aspects of this project.
  2. Give. Prayerfully consider how God would have you invest in this project.
What is the expected use for the space?

Gathering space before and after all events and services.

Meet-ups, prayer, LifeGroups, connecting space, coffee shop, etc. 

What impact (if any) will there be to Calvary Kids/ YTH?

Preliminary conversations have taken place to renovate some of those areas. 

  1. Convert half of gym to Youth Worship Auditorium by adding a wall around half- court that can be removed for larger events (i.e. Christmas Jamboree) that provides a more intimate/customized space for YTH services.  
  2. Convert G-2 (large classroom on floor level) to Elementary-themed Calvary Kids Auditorium.  
  3. Provide self check-in stations in new lobby area.
What about the playground from the video?

We have re-designed that space to be a multi-purpose, outdoor, green space so all ages can utilize before and after services, as well as special events. Playground in back of property to remain.

Will there still be free coffee with new café?

Yes, we will continue to provide free coffee.  Additionally, we will have specialty drinks, refreshments, food items, etc. for-purchase in the new café.